RCRA LARGE QUANTITY GENERATORS (GREATER THAN 1000 KG/MONTH HAZARDOUS WASTE GENERATION)

WRITTEN PLAN     CITATIONS:       40 CFR 265 Subpart (C) and (D)                                             CONTENTS OF EMERGENCY PLAN: The written plan must address the following:

Actions to be taken in response to emergencies;

Arrangements with police, fire, and hospital officials;

List of names, addresses, phone numbers of personnel qualified to act as emergency coordinators

List of emergency equipment; and

Evacuation plan for the facility.

TRAINING REQUIREMENTS            CITATION:       40 CFR Part 265.16         SCOPE OF TRAINING:  Provide specific training to employees involved in hazardous waste management (i.e., generating, handling, storing, labelling/recordkeeping). Training includes:

• general hazardous waste management;

• use, inspection, repair, replace emergency and monitoring equipment;

• communication or alarm systems;

• response to fires and explosions;

• response to groundwater contamination incidents;

• shutdown of operations;

• recordkeeping of employee training.

TRAINING FREQUENCY:    Within six months and annually thereafter.

TIME LEVEL OF TRAINING:    Not Specified

For a consulting proposal (Writing Emergency Plan or Training), call John Wiemhoff at:         JRW Environmental Consulting, Inc., 990 Ponderosa Lane, Barrington, IL  60010     Phone: (847) 705 7781                                   e-mail: jwiemhoff@jrwenviro.com               Web Site: http//www.jrwenviro.com                        [Program Develop]        [Env. Auditing]        [Training]         [Spill Plans]         [Projects and Permits]        [OSHA Consulting]        [USDOT HAZMAT]        [Top]      [Home]

sitemap room air conditioners